综合久久影院-综合久久伊人-综合久久一区二区三区-综合久久五月天-亚洲欧美日韩国产一区图片-亚洲欧美日韩国产一区二区三区精品

Muen
News

News

Enterprise service provider

location : Home > News > Technical information

The bearing capacity of high-voltage inverter for external faults and the fault recovery time of equipment

2023-05-20 13:35:30

The influence of external fault on input side, such as bus voltage drop caused by external power grid fault, on the operation of high voltage inverter. A power plant unit in Guangdong Province once had such an accident: due to the transient fault of the external power grid, the auxiliary power bus voltage flickered and dropped, leading to the shutdown of the auxiliary frequency converter. Although the fault of the external power grid was removed quickly, the important auxiliary equipment driven by the frequency converter stopped, which led to the unit load rejection. Therefore, the re start function of instantaneous power failure should be a reliable guarantee to improve the bearing capacity of external fault of high-voltage inverter of auxiliary equipment of power plant.


The influence of external faults on the output side, such as cable breakdown and short circuit, single-phase grounding or even phase to phase short-circuit fault on high-voltage inverter. The high-voltage inverter shall be equipped with single-phase grounding fault detection function, and set alarm or trip protection according to site conditions. According to statistics, there are about 20 sets of phase to phase short circuit fault caused by insulation damage of high-voltage motors in Guangdong Province every year. Although the relative probability is small, the impact of short-circuit current on the equipment of high-voltage inverter with extremely limited over-current capacity is huge, which may lead to serious fault of equipment damage. The bearing capacity and protection technology of high voltage inverter to output phase to phase short circuit is an important factor to be considered in equipment selection and equipment safety assurance.


Equipment faults can be divided into two types: one is the fault that can be recovered instantly. Once the fault occurs, it can recover itself in a short time. The frequency conversion device with automatic speed tracking function can significantly improve the operation ability and reliability under such fault conditions. Some of the high-voltage inverters in Guangdong Province are frequently shut down when lightning strikes in thunderstorm season;


The other is the recovery time of the device after permanent failure. The power unit modularization can replace the standby module in a short time, so that the equipment can resume operation in a short time.


General purpose frequency converter


label

QR code

The public,

Mobile station
The public, Mobile station

Contact

未標題-8.png 0755-81719517
未標題-10.png0755-81719530 未標題-11.pngamb@ambition.com.cn
未標題-12.pngFloor 1, 5 and 6, building 7, lijincheng science and technology industrial park, gongye dong road, longhua new district, shenzhen

Navigation

Home          About

Product      Case

Solution      Service

Job      News

Contact          

Copyright © Shenzhen Ambition Electronic Co., Ltd Record number:備案號:粵ICP備12045920號
主站蜘蛛池模板: 久青草国产在线视频亚瑟影视 | 四虎成人永久地址 | 麻豆国产一区 | 三级色网站 | 免费高清在线影片一区 | 97成人免费视频 | 亚洲欧美综合乱码精品成人网 | 欧美网站免费 | 在线免费观看黄 | 丁香五月网久久综合 | 经典三级一区二区三区视频 | 亚欧视频在线观看 | 视频在线a | 日本一本免费一二区 | 久久99热精品这里久久精品 | 国外成人在线视频网站 | 欧美亚洲欧美 | 女人体1963免费观看视频 | 在线观看日韩www视频免费 | 国产拍在线 | 特黄特级高清免费视频毛片 | swag国产精品一区二区 | 国产精品视频自拍 | 国产成人精品1024在线 | 欧美专区在线 | 日本一区视频在线播放 | 在线免费毛片 | 免费视频精品一区二区三区 | 日韩在线高清 | 牛牛在线精品免费视频观看 | 欧美成人午夜视频在线观看 | 一级特黄色毛片免费看 | 国产97免费视频 | 欧美日韩在线成人 | 久久99精品九九九久久婷婷 | 演员请就位第一季 | 国产精品视频分类 | 亚洲性一级理论片在线观看 | 极品色综合 | 四虎黄色影视 | 国产高清在线 |